Connect the 58.5 MW Camarines Sur Wind Farm to the Luzon grid, meeting the requirements of an international owner and the Philippine national grid.

ITS scope of work
- Supply of secondary systems and auxiliary supply for the project substations
- SCADA software and control computer configuration services
- Gateway configuration and P2P, E2E acceptance testing with the dispatch center