Control center integration for Northern Power Corporation (EVNNPC), connecting substations in three provinces.
ITS scope of work
- IED/BCU configuration for control, acquisition and signal processing to IEC 61850
- Meter data acquisition via Modbus RTU/TCP
- Signal connection to control centers in 3 provinces via IEC 60870-5-104
HMI/SCADA software: zenon (COPA-DATA)
Substations
110 kV substations: Thuan Chau, Phu Yen, Song Ma, Lac Son, Mai Chau, Hoa Binh, Vinh Tuong, Lap Thach, Moc Chau, Son La, Muong La, Luong Son, Trung Son, Thanh Nong, Vinh Yen, Phuc Yen and Thien Ke.