Tay Nguyen Wind Farm 110 kV Substation

Substation automation and SCADA integration for the 110 kV substation of the Tay Nguyen wind farm.

ITS scope of work

Stage 1

  • Configuration of IEDs/BCUs for bay control, signal acquisition and processing to IEC 61850
  • Metering data acquisition via Modbus RTU
  • Connection of all signals to the OCCs, NLDC (A0) and CRLDC (A3) via IEC 60870-5-104
  • Point-to-point and end-to-end commissioning with NLDC (A0), CRLDC (A3) and the power plant

Stage 2

  • Integration of the 110 kV substation control system with the GE wind power system (WindCONTROL, WindSCADA)
  • COD (Commercial Operation Date) testing with NLDC (A0), CRLDC (A3) and the power plant

HMI/SCADA software: zenon (COPA-DATA)