We are urgently preparing for the project Phuoc Thai 1

The project was started in September 2019, built in Phuoc Thai commune, Ninh Phuoc district, Ninh Thuan province. With a capacity of 50MWp, when put into operation, about 80.975 million kWh will be added to the national power system.
In this project, EITS., JSC supplies secondary control & protection cubicles, CSCS / SCADA software and configuration services.

As one of the units in the Phuoc Thai 1 project, we coordinate with related units, focusing all resources to accelerate the project. By April 30, 2020, the 220 kV transmission lines and the substation must be energized to release the renewable energy capacity. By July 31, 2020, the entire of Phuoc Thai 1 Solar Power Plant will be put into operation.